{"id":923,"date":"2026-02-09T07:06:38","date_gmt":"2026-02-09T07:06:38","guid":{"rendered":"https:\/\/www.srinsoft.engineering\/blogs\/?p=923"},"modified":"2026-02-26T10:39:38","modified_gmt":"2026-02-26T10:39:38","slug":"the-hidden-cost-of-manual-revisions-how-bim-cad-design-automation-in-construction-stops-rfis-and-rework","status":"publish","type":"post","link":"https:\/\/www.srinsoft.engineering\/blogs\/the-hidden-cost-of-manual-revisions-how-bim-cad-design-automation-in-construction-stops-rfis-and-rework\/","title":{"rendered":"The Hidden Cost of Manual Revisions. How BIM\u00a0CAD Design\u00a0Automation\u00a0in Construction\u00a0Stops RFIs and Rework\u00a0"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new_Blog-copy-1024x538.jpg\" alt=\"2D Design Automation\" class=\"wp-image-924\" srcset=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new_Blog-copy-1024x538.jpg 1024w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new_Blog-copy-300x158.jpg 300w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new_Blog-copy-768x403.jpg 768w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new_Blog-copy.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong><em>Imagine&nbsp;you\u2019re&nbsp;in a time loop, but you&nbsp;don\u2019t&nbsp;reset to zero.<\/em><\/strong>&nbsp;<\/p>\n\n\n\n<p>Now imagine project revisions working the same way. In traditional construction workflows,&nbsp;<strong><em>a single structural change forces a &#8216;reset&#8217;\u2014a manual marathon to update every floor plan, section, and schedule<\/em><\/strong>. With&nbsp;Design Automation,&nbsp;that cycle is broken. You continue from the last stable version, changes propagate across the&nbsp;entire set&nbsp;automatically, and the manual redraw marathon disappears.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Most articles about&nbsp;<a href=\"https:\/\/www.srinsoft.engineering\/blogs\/bim-automation-in-construction\/\" target=\"_blank\" rel=\"noreferrer noopener\">2D&nbsp;design automation&nbsp;and 3D design automation<\/a>&nbsp;talk about &#8220;efficiency gains&#8221; and &#8220;digital transformation.&#8221;&nbsp;Let&#8217;s skip the buzzwords and focus on what&nbsp;actually changes&nbsp;in your day-to-day work.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cost of Inaction&nbsp;in&nbsp;BIM CAD Design&nbsp;Automation&nbsp;<\/h2>\n\n\n\n<p>Every project you run without automation,&nbsp;you&#8217;re&nbsp;absorbing costs that&nbsp;don&#8217;t&nbsp;show up on a line item. The coordination errors&nbsp;that&nbsp;<strong><em>become&nbsp;change orders<\/em><\/strong>. The RFIs that could have been&nbsp;<strong><em>prevented with consistent documentation<\/em><\/strong>.&nbsp;The list goes on.&nbsp;<\/p>\n\n\n\n<p>Your best people are spending&nbsp;<strong><em>forty hours a week on clerical updates instead of solving actual coordination problems<\/em><\/strong>.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Meanwhile, the firms that invested in automation two years ago are winning projects you used to compete for.&nbsp;They&#8217;re&nbsp;responding to RFPs&nbsp;faster,&nbsp;their fee proposals are tighter because they know their coordination costs, and their risk profile is lower because&nbsp;they catch conflicts before steel gets ordered.&nbsp;<\/p>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq tl-dr-box has-background\" style=\"background-color:#ffe4e8;padding-top:15px;padding-right:15px;padding-bottom:15px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong>TL;DR\u00a0<\/strong>\u00a0<\/h3><div class=\"aioseo-faq-block-answer\">\n<p>If moving one wall forces your team to update twenty sheets, your BIM process is broken. Design automation ties drawings, schedules, and tags to&nbsp;a single source, so changes&nbsp;don\u2019t&nbsp;create RFIs, rework, or late-night ire drills.&nbsp;It\u2019s&nbsp;about stopping preventable coordination failures.<\/p>\n<\/div><\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Breaks Without&nbsp;AEC Design&nbsp;Automation&nbsp;in Construction&nbsp;<\/h2>\n\n\n\n<p>The&nbsp;midnight&nbsp;email lands in your inbox: &#8220;Client wants to move the mechanical room 15 feet west.&#8221; Your mind&nbsp;immediately&nbsp;starts the calculation. Architectural floor plans need updates. The reflected ceiling plan changes. MEP coordination drawings are now wrong. Every building section that cuts through that area needs revision. Wall sections, door schedules, equipment&nbsp;schedules\u2014they all need attention.&nbsp;You&#8217;re&nbsp;looking at updates across&nbsp;maybe twenty&nbsp;sheets, minimum.&nbsp;<\/p>\n\n\n\n<p><strong><em>But the&nbsp;real cost&nbsp;includes the&nbsp;communication overhead<\/em><\/strong>&nbsp;of explaining the same change across six different trade teams, each needing to understand how it affects their scope.&nbsp;And&nbsp;<strong><em>the errors that slip through when&nbsp;you&#8217;re&nbsp;manually updating&nbsp;sheets<\/em><\/strong>&nbsp;and your brain stops catching the details that matter.&nbsp;<\/p>\n\n\n\n<p>Worst of all, the decision paralysis&nbsp;and handling the stakeholders&nbsp;who&nbsp;treat design changes like radioactive material.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Three Things&nbsp;BIM CAD&nbsp;Design Automation Actually Fixes&nbsp;<\/h2>\n\n\n\n<p><strong>Fix&nbsp;#1: Parametric Dependencies&nbsp;<\/strong>&nbsp;<\/p>\n\n\n\n<p>When that mechanical room moves 15 feet west, parametric automation knows&nbsp;what&#8217;s&nbsp;connected. Door tags update to reflect the new room number. Room schedules recalculate square footage&nbsp;without you&nbsp;touching a cell. Section cuts automatically reflect the new wall positions. Equipment schedules&nbsp;maintain&nbsp;their references to the relocated room.&nbsp;<strong><em>The relationships you built into the model do the clerical work<\/em><\/strong>&nbsp;while you focus on whether the change&nbsp;actually works.&nbsp;<\/p>\n\n\n\n<p><strong>Reality check:<\/strong>&nbsp;this&nbsp;doesn&#8217;t&nbsp;eliminate&nbsp;all manual work. You still need to verify clearances, check that the door swing makes sense in the new layout, and coordinate with MEP about how their routing changes. But&nbsp;<strong><em>you&#8217;re spending&nbsp;time on&nbsp;thinking work<\/em><\/strong>\u2014the engineering judgment calls that&nbsp;actually require&nbsp;your expertise\u2014instead of manually updating text on forty different sheets.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-3-1024x538.jpg\" alt=\"BIM automation solutions\" class=\"wp-image-927\" srcset=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-3-1024x538.jpg 1024w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-3-300x158.jpg 300w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-3-768x403.jpg 768w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-3.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Fix&nbsp;#2: Consistency Across Documents&nbsp;<\/strong>&nbsp;<\/p>\n\n\n\n<p>You know that sinking feeling when you find a dimension on Sheet A-201 that contradicts the plan on A-101? Someone updated one view and forgot the other. The RFI arrives three weeks later asking which dimension is correct.&nbsp;<a href=\"https:\/\/www.srinsoft.engineering\/automation-service\/\" target=\"_blank\" rel=\"noreferrer noopener\">Design automation<\/a>&nbsp;reduces&nbsp;this problem because information&nbsp;<strong><em>lives in one place and&nbsp;displays&nbsp;in multiple views<\/em><\/strong>. Change the wall location in the model, and every sheet that references that wall updates.&nbsp;<\/p>\n\n\n\n<p>This enables three things that matter: confidence in your coordination process, faster RFI responses because&nbsp;you&#8217;re&nbsp;not hunting for which drawing has the &#8220;right&#8221; answer, and subcontractors who&nbsp;actually trust&nbsp;your documents instead of building contingency into every bid.&nbsp;<\/p>\n\n\n\n<p><strong>Reality check:<\/strong>&nbsp;This only works if your modeling standards are solid. Garbage&nbsp;in, garbage out still applies. If your team is modeling walls as generic boxes instead of actual wall families, or if room boundaries&nbsp;aren&#8217;t&nbsp;properly defined, automation&nbsp;won&#8217;t&nbsp;save you. But when&nbsp;you&#8217;ve&nbsp;built&nbsp;good information&nbsp;into the model, consistency follows automatically.&nbsp;<br>&nbsp;<br>Also keep in mind that while automation excels with standard geometries, its implementation becomes increasingly intricate when applied to complex modeling or unconventional architectural forms.&nbsp;<br>&nbsp;<br><strong>Fix&nbsp;#3: Clash Detection<\/strong>&nbsp;<\/p>\n\n\n\n<p><strong><em>Finding a duct-beam conflict in Navisworks costs you thirty minutes in a coordination meeting.&nbsp;Finding it when the ironworkers are standing around on site waiting for an answer costs you $2,500<\/em><\/strong>&nbsp;in labor and a schedule&nbsp;delay&nbsp;you&#8217;ll&nbsp;be explaining in the next owner meeting.&nbsp;<\/p>\n\n\n\n<p>Automated&nbsp;<a href=\"https:\/\/www.srinsoft.engineering\/blogs\/bim-clash-detection\/\" target=\"_blank\" rel=\"noreferrer noopener\">clash detection<\/a>&nbsp;lets you run checks in the background&nbsp;once you set it up nicely. The software prioritizes conflicts by severity\u2014hard clashes between structural and MEP get flagged differently than clearance issues. You can track resolution status across revisions, so you know exactly which conflicts got fixed and which ones are still open heading into the next coordination meeting.&nbsp;<\/p>\n\n\n\n<p><strong>Reality check:<\/strong>&nbsp;you&#8217;ll&nbsp;still have clashes. Automation&nbsp;doesn&#8217;t&nbsp;prevent bad design decisions or&nbsp;eliminate&nbsp;the complexity of routing ductwork around&nbsp;structure.&nbsp;&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-4-1024x538.jpg\" alt=\"BIM Mechanical Automation\" class=\"wp-image-928\" srcset=\"https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-4-1024x538.jpg 1024w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-4-300x158.jpg 300w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-4-768x403.jpg 768w, https:\/\/www.srinsoft.engineering\/blogs\/wp-content\/uploads\/2026\/02\/Blog-new-4.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong>Direct Answer<\/strong>\u00a0<\/p>\n\n\n\n<p>CAD and\u00a0design automation\u00a0replace manual drafting with\u00a0<strong>synchronized workflows<\/strong>. By using parametric dependencies, a single change\u2014like moving a wall\u2014automatically updates all related floor plans, sections, and schedules. This\u00a0eliminates\u00a0clerical errors, ensures document consistency, and catches costly structural clashes before they reach the field.\u00a0<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">BIM CAD Design Automation &#8211;&nbsp;The Implementation Truth<strong>&nbsp;<\/strong>&nbsp;<\/h2>\n\n\n\n<p><strong>Your team will resist, with reason.<\/strong>&nbsp;<\/p>\n\n\n\n<p>They&#8217;ve&nbsp;seen &#8220;game-changing&#8221; software before. They sat through the last three vendor demos that promised to revolutionize everything, then spent six months fighting with software that&nbsp;didn&#8217;t&nbsp;understand how construction&nbsp;actually works.&nbsp;&nbsp;<\/p>\n\n\n\n<p>This is&nbsp;actually valuable\u2014those workarounds exist because your processes have gaps\u2014but it&#8217;s painful.&nbsp;You&#8217;re&nbsp;not just installing software.&nbsp;<strong><em>You&#8217;re&nbsp;doing change management<\/em><\/strong>, documenting workflows that have lived in people&#8217;s heads for&nbsp;years, and&nbsp;having uncomfortable conversations about why things have always been&nbsp;done&nbsp;a certain way.&nbsp;<\/p>\n\n\n\n<p>But every&nbsp;consultant&nbsp;will&nbsp;admit&nbsp;that&nbsp;the first few projects will be slower.&nbsp;The way to address this is simple but requires patience. Start with one project type\u2014tenant improvements work well because&nbsp;they&#8217;re&nbsp;contained&nbsp;and repetitive.&nbsp;<strong><em>Prove the value&nbsp;on&nbsp;something manageable<\/em><\/strong>&nbsp;before rolling it out&nbsp;enterprise-wide. Let your team see the benefit on a project that&nbsp;won&#8217;t&nbsp;sink the company if the learning curve takes longer than expected.&nbsp;<\/p>\n\n\n\n<p><strong>The ROI&nbsp;doesn&#8217;t&nbsp;show up where you expect<\/strong>&nbsp;<\/p>\n\n\n\n<p>You&nbsp;won&#8217;t&nbsp;necessarily complete projects faster. Permitting timelines&nbsp;exist. Procurement still takes time. The construction schedule is still driven by concrete curing and long-lead equipment deliveries.&nbsp;<\/p>\n\n\n\n<p>Where you will see benefits:&nbsp;<strong><em>fewer RFIs driven by conflicting documentation<\/em><\/strong>, because your drawings are&nbsp;actually coordinated. Faster response time to design changes late in the process, when the owner decides they want that wall&nbsp;moved&nbsp;after all. Reduced liability from coordination errors that would have turned into change orders. More time for your BIM team to do analysis and solve actual problems instead of spending their days updating sheet indexes.&nbsp;<\/p>\n\n\n\n<p>You need someone who&nbsp;actually understands&nbsp;both the tools AND construction&nbsp;<\/p>\n\n\n\n<p>The winning combination is a BIM manager&nbsp;who&#8217;s&nbsp;spent time in the field and understands why details matter, combined with the patience to build templates and standards that match how your teams&nbsp;actually work.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why&nbsp;SrinSoft?&nbsp;<\/h2>\n\n\n\n<p>Design automation will not make your projects exciting. It will make them predictable. Firms that implement it correctly reduce revision-driven RFIs, shorten late-stage design response time, and stop burning senior BIM staff on clerical updates.&nbsp;<\/p>\n\n\n\n<p>SrinSoft&nbsp;Engineering,&nbsp;with their&nbsp;<a href=\"https:\/\/www.srinsoft.engineering\/bim-service\/\" target=\"_blank\" rel=\"noreferrer noopener\">3D\u202fBIM\u202fmodeling\u202fservices<\/a>&nbsp;and BIM drafting services,&nbsp;helps BIM teams build automation that reflects how construction&nbsp;actually works. Not demo workflows. Not generic templates. Real standards tied to real coordination problems.&nbsp;Clients typically see fewer documentation conflicts and faster turnaround on late owner changes within the first few projects.&nbsp;<\/p>\n\n\n\n<p>If your team is still redrawing sheets after every design change, the problem is not effort.&nbsp;It\u2019s&nbsp;the workflow. Talk to&nbsp;SrinSoft&nbsp;<a href=\"https:\/\/www.srinsoft.engineering\/design-service\/\" target=\"_blank\" rel=\"noreferrer noopener\">Design Automation Services&nbsp;team<\/a>&nbsp;about bringing stability and consistency back into your revision cycles.&nbsp;<\/p>\n\n\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-1&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-1-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-1\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\">FAQs&nbsp;<\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-1\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-1-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq has-ast-global-color-5-background-color has-background\" style=\"padding-top:0px;padding-right:15px;padding-bottom:0px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong>1. How do we stop updating 20 sheets every time the client moves one wall<\/strong>\u00a0<\/h3><div class=\"aioseo-faq-block-answer\">\n<p>You stop treating drawings as independent files. You model the wall once, with parametric relationships. Plans, sections, schedules, tags, and quantities reference that&nbsp;single source. Move the wall, everything updates.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq has-ast-global-color-5-background-color has-background\" style=\"padding-right:15px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong>2.\u00a0Is design automation\u00a0actually worth it\u00a0or is it just another\u00a0Revit headache<\/strong>\u00a0<\/h3><div class=\"aioseo-faq-block-answer\">\n<p>It\u2019s&nbsp;worth&nbsp;it only&nbsp;if you invest in standards and workflows. If you expect automation to fix sloppy modeling, it will fail. Firms that say \u201cit didn\u2019t work\u201d usually&nbsp;skipped&nbsp;template development, naming rules, and training.&nbsp;&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq has-ast-global-color-5-background-color has-background\" style=\"padding-right:15px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong>3.\u00a0What parts of\u00a0CAD\u00a0and\u00a0BIM\u00a0drafting can realistically be automated today?<\/strong>\u00a0<\/h3><div class=\"aioseo-faq-block-answer\">\n<p>Anything repetitive and&nbsp;rules-based. Sheet creation, view placement, tagging, schedules, dimension propagation, revision updates, clash checks, and quantity extraction.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq has-ast-global-color-5-background-color has-background\" style=\"padding-top:0px;padding-right:15px;padding-bottom:0px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong>4.\u00a0How do parametric changes prevent\u00a0RFIs\u00a0and site clashes in real projects<\/strong><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>RFIs explode when drawings contradict each other. Parametric models&nbsp;eliminate&nbsp;duplicate&nbsp;information. When a wall moves, every dependent view reflects the same truth. Clash detection then runs on consistent geometry.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq has-ast-global-color-5-background-color has-background\" style=\"padding-top:0px;padding-right:15px;padding-bottom:0px;padding-left:15px\"><h3 class=\"aioseo-faq-block-question\"><strong><strong>5.\u00a0How do firms implement design automation without slowing projects for six months?<\/strong><\/strong><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>They&nbsp;don\u2019t&nbsp;roll it out everywhere. They pilot it on one repeatable project type. Tenant improvements. Typical floors. Standard plant rooms. They accept short-term&nbsp;slowdown&nbsp;to&nbsp;eliminate&nbsp;long-term rework.&nbsp;<\/p>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Imagine&nbsp;you\u2019re&nbsp;in a time loop, but you&nbsp;don\u2019t&nbsp;reset to zero.&nbsp; Now imagine project revisions working the same way. In traditional construction workflows,&nbsp;a [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":924,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[3],"tags":[],"class_list":["post-923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/posts\/923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/comments?post=923"}],"version-history":[{"count":5,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/posts\/923\/revisions"}],"predecessor-version":[{"id":933,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/posts\/923\/revisions\/933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/media\/924"}],"wp:attachment":[{"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/media?parent=923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/categories?post=923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.srinsoft.engineering\/blogs\/wp-json\/wp\/v2\/tags?post=923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}